工程管理专业外语翻译.
土建工作包括建造道路、建筑物、基础和钢筋混凝土结构.(civil work )
承包商应有一个测试实验室来进行合同要求的所有测试.(Testing Laboratory )
我们可以通过四个指标评价现场施工的成绩,即质量、时间进度、费用和安全.(Evaluate )
项目完工,承包商应准备移交的所有检验文件 .(turnover )
我们应用科学管理体系处理材料短缺.(material shortage )
这台塔吊能吊起20吨的重物.(The tower crane )
我相信所有发运的机器都已经过预装配. (pre-assembled )
在我们的大多数工程项目中都采用关键路线法安排计划. (Critical Path Method )
工程管理专业外语翻译.
Civil construction work includes construction of roads, buildings, infrastructure and reinforced concrete structures
Contractor should have a testing laboratory to carry out all tests required by the contract.
We can evaluate the results through the construction of four indicators, there are quality, schedule, cost and safety.
The project is finish, the contractor should be prepared to transfer all the test files.
We apply scientific management system to deal with the shortage of materials
This crane can lift 20 tons of weight
I believe that all the machines which were shipped have been pre-assembled.
The critical path method have been adopted to arrange the plan in most of our projects.