北京首都机场扩建工程是2008年北京奥运会重要配套项目,是经国务院批准建设的国家重点工程.三号航站楼为本次扩建工程的核心,位于东跑道东侧,地下2层,地上5层,长2900米,宽790米,建筑高度45米,其中,T3A主楼工程建筑面积48万平方米,是三号楼的核心工程,由北京城建七公司等兄弟单位承建的首都机场3号航站楼T3A主楼工程被获建筑(结构)长城杯金质奖.
今年城建七首都机场项目部完成绑扎钢筋10000多吨,支立模板约30多万平方米,浇筑混凝土48000多立方米,完成钢结构760吨,完成结构面积6.8万平米,二次结构施工完成砌筑4千多平米,抹灰3万多平米,率先优质完成了结构、外管线管廊及部分登机桥结构施工任务,目前该工程以进入粗装修阶段.
译文:
Beijing Capital Airport expansion project is the 2008 Beijing Olympic Games an important ancillary projects, the State Council approved the construction of the national key projects. Based on the 3rd terminal expansion project at the core of the runway east of the East, the underground level 2, ground floor, the long 2,900 m, width 790 meters, building height 45 m, of which, T3A main building construction area of 480,000 sq ft.
Seven of this year urban construction project of the Capital Airport completed banding reinforced more than 10,000 tons, to set up a template about more than 30 million square meters, pouring concrete over 48,000 cubic meters, completed steel structure 760 tons, the completion of the structure of 68,000 square meters, secondary structure construction completed jigsaw puzzle built 4 over 1,000 square meters, plastering over 30,000 square meters, completed the first high-quality structure, the Gallery of pipelines and construction of the airbridge mission structure, the renovation works to enter the rough stage.
今年城建七首都机场项目部完成绑扎钢筋10000多吨,支立模板约30多万平方米,浇筑混凝土48000多立方米,完成钢结构760吨,完成结构面积6.8万平米,二次结构施工完成砌筑4千多平米,抹灰3万多平米,率先优质完成了结构、外管线管廊及部分登机桥结构施工任务,目前该工程以进入粗装修阶段.
译文:
Beijing Capital Airport expansion project is the 2008 Beijing Olympic Games an important ancillary projects, the State Council approved the construction of the national key projects. Based on the 3rd terminal expansion project at the core of the runway east of the East, the underground level 2, ground floor, the long 2,900 m, width 790 meters, building height 45 m, of which, T3A main building construction area of 480,000 sq ft.
Seven of this year urban construction project of the Capital Airport completed banding reinforced more than 10,000 tons, to set up a template about more than 30 million square meters, pouring concrete over 48,000 cubic meters, completed steel structure 760 tons, the completion of the structure of 68,000 square meters, secondary structure construction completed jigsaw puzzle built 4 over 1,000 square meters, plastering over 30,000 square meters, completed the first high-quality structure, the Gallery of pipelines and construction of the airbridge mission structure, the renovation works to enter the rough stage.