水泵说明书英文翻译Divide the demolition and re-installation ⑴. Trip w
来源:学生作业帮 编辑:大师作文网作业帮 分类:英语作业 时间:2024/09/23 04:37:54
水泵说明书英文翻译
Divide the demolition and re-installation
⑴. Trip will be set up to regulate 100% and disconnect the power motor. ⑵. The release of all the pressure pipeline system.
⑶. When invited to take the demolition warnings in the list of all preventive measures. ⑷. Import and export of cut-off valve closed.
⑸. Pump in the head at a location at the bottom of the pot containing Lou Ye. ⑹. The pipeline from the pump head off location, in accordance with the safety of all pumping from the media.
⑺. Demolition of all screws, leaving only pump in the head position at the top of a screwdriver. When the screw when the media release from the head position of the pump leaked out.
⑻. Tilt the head position will pump check valve in the residual liquid into a suitable container, in compliance with safety instructions.
⑼. Demolition of the remaining one screw, use the appropriate medium wash or clean the pump head position and divide. ⑽. Counterclockwise rotation removed the divide.
⑾. Check whether the divide and enhance the board from cracks or damage. If damage should be replaced.
⑿. Installation divide. Clockwise will be installed to divide axis.
⒀. Installation of pumps in the head position should be the turn of the screw fastening to ensure that the force uniform.
Divide the demolition and re-installation
⑴. Trip will be set up to regulate 100% and disconnect the power motor. ⑵. The release of all the pressure pipeline system.
⑶. When invited to take the demolition warnings in the list of all preventive measures. ⑷. Import and export of cut-off valve closed.
⑸. Pump in the head at a location at the bottom of the pot containing Lou Ye. ⑹. The pipeline from the pump head off location, in accordance with the safety of all pumping from the media.
⑺. Demolition of all screws, leaving only pump in the head position at the top of a screwdriver. When the screw when the media release from the head position of the pump leaked out.
⑻. Tilt the head position will pump check valve in the residual liquid into a suitable container, in compliance with safety instructions.
⑼. Demolition of the remaining one screw, use the appropriate medium wash or clean the pump head position and divide. ⑽. Counterclockwise rotation removed the divide.
⑾. Check whether the divide and enhance the board from cracks or damage. If damage should be replaced.
⑿. Installation divide. Clockwise will be installed to divide axis.
⒀. Installation of pumps in the head position should be the turn of the screw fastening to ensure that the force uniform.
拆卸和重新安装分
⑴.旅行将建立规范100%和断开电源,电机.⑵.所有的压力管道系统的释放.
⑶.当被邀请在所有的预防措施以拆除警告列表.⑷.进口和出口关闭截止阀.
⑸.在含有娄烨罐底部位置的泵头.⑹.从泵头位置的管道,按照各抽来自媒体的安全.
⑺.所有螺丝拆除,只留下泵在螺丝刀头的位置上.当螺杆在媒体上发布从泵头位置泄漏.
⑻.倾斜头部的位置将止回阀在剩余的液体倒入适当的容器中,在与安全指南依从性.
⑼.剩下的一个螺丝,拆卸,使用适当的介质清洗或清洗泵头的位置和分.⑽.逆时针旋转将分.
⑾.检查是否将从裂缝或损坏的加强板.如果损坏应更换.
⑿.安装分.顺时针方向将安装分轴.
⒀.在头部的位置,泵的安装应的紧固螺钉,确保受力均匀的转.
⑴.旅行将建立规范100%和断开电源,电机.⑵.所有的压力管道系统的释放.
⑶.当被邀请在所有的预防措施以拆除警告列表.⑷.进口和出口关闭截止阀.
⑸.在含有娄烨罐底部位置的泵头.⑹.从泵头位置的管道,按照各抽来自媒体的安全.
⑺.所有螺丝拆除,只留下泵在螺丝刀头的位置上.当螺杆在媒体上发布从泵头位置泄漏.
⑻.倾斜头部的位置将止回阀在剩余的液体倒入适当的容器中,在与安全指南依从性.
⑼.剩下的一个螺丝,拆卸,使用适当的介质清洗或清洗泵头的位置和分.⑽.逆时针旋转将分.
⑾.检查是否将从裂缝或损坏的加强板.如果损坏应更换.
⑿.安装分.顺时针方向将安装分轴.
⒀.在头部的位置,泵的安装应的紧固螺钉,确保受力均匀的转.
水泵说明书英文翻译Divide the demolition and re-installation ⑴. Trip w
Uninstall(remove)the existing installation and settings
英语翻译The installation is simple and spsce saving.All modules
英语翻译1.Always refer to the manufacturer for installation and
They're enjoying the school trip.
Friendship multiplies the good of life and divide the
英语翻译Davis and Jack are friends.They make a trip around the w
Divide And Conquer 歌词
安装错误的英文翻译Local machine: installation failed Installation: Er
外文文献英文翻译题目:Stakeholder Theory and“The Corporate Objective Re
英语翻译plumbing and drainage installation
Demolition of that victory?That is the biggest flaw!