英语翻译VI.Volume,velocity and integrity testing will be complet
来源:学生作业帮 编辑:大师作文网作业帮 分类:英语作业 时间:2024/09/20 23:30:58
英语翻译
VI.Volume,velocity and integrity testing will be completed as specified in SOP #XXX,“Certification of HEPA Filters in HVAC System”.
VII.Pressure testing will be completed as specified in SOP #XXX,"Routine Monitoring Program Pressure Differential Monitoring Device".
VIII.Particulate testing will be completed as specified in SOP #XXX,"Operation of the Met One Laser Particle Counter" and SOP #XXX,"Operation of the Met One Particle Counter".
Confirm any distribution piping which is downstream of the desiccant dryer and which carries product-contact air is type “K” or “L” hard drawn degreased copper piping.Confirm that the piping after the point-of-use filter is type 316 stainless steel.
VI.Volume,velocity and integrity testing will be completed as specified in SOP #XXX,“Certification of HEPA Filters in HVAC System”.
VII.Pressure testing will be completed as specified in SOP #XXX,"Routine Monitoring Program Pressure Differential Monitoring Device".
VIII.Particulate testing will be completed as specified in SOP #XXX,"Operation of the Met One Laser Particle Counter" and SOP #XXX,"Operation of the Met One Particle Counter".
Confirm any distribution piping which is downstream of the desiccant dryer and which carries product-contact air is type “K” or “L” hard drawn degreased copper piping.Confirm that the piping after the point-of-use filter is type 316 stainless steel.
VI.体积、速度和正直测试在SOP #XXX上指定将完成,“HEPA过滤器的证明在HVAC系统的”.VII.压力试验在SOP #XXX,"上指定将完成; 定期监控程序压力差监视Device".VIII.属于颗粒的测试在SOP #XXX,"上指定将完成; 遇见的一个激光微粒Counter"的操作; 并且SOP #XXX," 遇见的一个微粒Counter"的操作;.证实是顺流去湿烘干机和运载产品联络空气是类型“K”或“L”艰苦被画的被除油的铜管道系统的所有发行管道系统.证实在以后的管道系统点使用过滤器是类型316不锈钢.
希望有助于你
希望有助于你
英语翻译VI.Volume,velocity and integrity testing will be complet
英语翻译When his second volume appears,there will be an almost c
GRE阅读里的句子.It denies to the past an integrity and will of its
英语翻译pressure testing should be carried out on all equipment
英语翻译A large container ship may be loaded or unloaded complet
英语翻译special testing program for reeling installation and spe
英语翻译ITCINSTITUTE FOR TESTING AND CERTIFICATION,Inc.Zlin,Czec
英语翻译the difference between formal and informal testing exist
英语翻译1.2 Inspection and Testing During ManufactureThe Enginee
英语翻译6 ConclusionBased upon hardness testing,XRD analysis and
英语翻译THE TEST BOX VOLUME IS ZERO.PLEASE ENTER A VOLUME AND TR
英语翻译4.Check the Flip Flop movement of system and integrity o