英语翻译2.1foundationIn order to inspect the electric fittings i
来源:学生作业帮 编辑:大师作文网作业帮 分类:英语作业 时间:2024/11/10 11:22:34
英语翻译
2.1foundation
In order to inspect the electric fittings in the foundation remove ametal plate from the ground platform and go down into the foundation.
2.1.1water entry
inspect the foundation for traces of water entry in case of stagnant water ,this must be removedimmediately.Renewed water entry must beprevented by re-sealing the joint between the lower tower segment and the foundation ring from the outside.
2.1.2lines,cables,and cable connections
visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion.Missing wear or edge protecion must be refitted,if required,or correctly positioned.
2.1.3Potential equalization
Inspect the terminals of the ground cable for tight fit.Visually inspect the potential equalization rail for corrosion .If the rail is damaged severely,it mustbe replaced.
2.2Tower bottom/tower body
2.2.1Lines,cables,and cable connections
Visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion .Missing wear or edge protection must be refitte,if required,or correctly positioned.The cables in the tower body must be tightened and must not sag.
2.2.2Cable support
Inspect the tight assembly of the cable support and the tight fit of the cables in the supports.
2.2.3Sockets
Check the shockproof and the CEE sockets for funcion ,using a gauge.
2.2.4Tower lighting/emergency lighting
Check the tower lighting for function by switching it on.Replace defect luminaries.
Check the function of the emergency lighting in the tower and the nacelle by simulating a power failure,e.g.byactivating the fuses in the tower bottom.The emergency lighting must illuminate automatically.If required,the test switches located on the lamps can be turned on.
2.2.5Terminal points
CAUTION
230V AC/400V AC/690V AC Before the screw connections are inspected,the cable harness in the transformer substation must be disconnected.In addition,use insulated tools.
The screw connections in the terminal and connection cabinets are visually inspected and checked for tight fit.Tighten the nuts if required.(Refer to 2.3.3for torques)
可能出自某篇关于能源的论文,俺一直在网上没找到。
PS.单词都很认真的查过,如果有大神想翻译不会的词俺可以逐个解释。
用翻译器的童鞋们。也太不认真了吧。
2.1foundation
In order to inspect the electric fittings in the foundation remove ametal plate from the ground platform and go down into the foundation.
2.1.1water entry
inspect the foundation for traces of water entry in case of stagnant water ,this must be removedimmediately.Renewed water entry must beprevented by re-sealing the joint between the lower tower segment and the foundation ring from the outside.
2.1.2lines,cables,and cable connections
visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion.Missing wear or edge protecion must be refitted,if required,or correctly positioned.
2.1.3Potential equalization
Inspect the terminals of the ground cable for tight fit.Visually inspect the potential equalization rail for corrosion .If the rail is damaged severely,it mustbe replaced.
2.2Tower bottom/tower body
2.2.1Lines,cables,and cable connections
Visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion .Missing wear or edge protection must be refitte,if required,or correctly positioned.The cables in the tower body must be tightened and must not sag.
2.2.2Cable support
Inspect the tight assembly of the cable support and the tight fit of the cables in the supports.
2.2.3Sockets
Check the shockproof and the CEE sockets for funcion ,using a gauge.
2.2.4Tower lighting/emergency lighting
Check the tower lighting for function by switching it on.Replace defect luminaries.
Check the function of the emergency lighting in the tower and the nacelle by simulating a power failure,e.g.byactivating the fuses in the tower bottom.The emergency lighting must illuminate automatically.If required,the test switches located on the lamps can be turned on.
2.2.5Terminal points
CAUTION
230V AC/400V AC/690V AC Before the screw connections are inspected,the cable harness in the transformer substation must be disconnected.In addition,use insulated tools.
The screw connections in the terminal and connection cabinets are visually inspected and checked for tight fit.Tighten the nuts if required.(Refer to 2.3.3for torques)
可能出自某篇关于能源的论文,俺一直在网上没找到。
PS.单词都很认真的查过,如果有大神想翻译不会的词俺可以逐个解释。
用翻译器的童鞋们。也太不认真了吧。
2.1foundation
In order to inspect the electric fittings in the foundation remove a metal plate from the ground platform and go down into the foundation.
2.1 地基
要检查地基的电气配件,移开地面平台的一块铁板,就可进入地基内部.
2.1.1water entry
inspect the foundation for traces of water entry in case of stagnant water ,this must be removed immediately.Renewed water entry must be prevented by re-sealing the joint between the lower tower segment and the foundation ring from the outside.
2.1.1 渗水
如发现积水,应检查渗水痕迹并即刻处理.为了避免再渗水,必须对底层塔区与底圈外部之间的接合处重新进行密封处理.
2.1.2lines,cables,and cable connections
visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion.Missing wear or edge protection must be refitted,if required,or correctly positioned.
2.1.2 电线、电缆及电缆连接器
以肉眼检查所有的电线、电缆及电缆连接器是否有破损与腐蚀.遗失的仪器或边角保护,如有需要必须重新装上或正确地放置.
2.1.3Potential equalization
Inspect the terminals of the ground cable for tight fit.Visually inspect the potential equalization rail for corrosion .If the rail is damaged severely,it must be replaced.
2.1.3 电位均衡
检查接地电缆的终端头确保紧密配合.肉眼检查电位钢轨是否被腐蚀.如果钢轨损坏严重,必须更换.
2.2Tower bottom/tower body
2.2 塔底/塔体
2.2.1Lines,cables,and cable connections
Visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion .Missing wear or edge protection must be refitte,if required,or correctly positioned.The cables in the tower body must be tightened and must not sag.
2.2.1电线、电缆及电缆连接器
以肉眼检查所有的电线、电缆及电缆连接器是否有破损与腐蚀.遗失的仪器或边角保护,如有需要必须重新装上或正确地放置.塔体的电缆必须紧固,不可松弛下陷.
2.2.2Cable support
Inspect the tight assembly of the cable support and the tight fit of the cables in the supports.
2.2.2 电缆托架
检查确保电缆托架组件的紧固,以及托架上电缆的紧固配合.
2.2.3 Sockets
Check the shockproof and the CEE sockets for function,using a gauge.
2.2.3 插座
使用测量仪器检查抗电击及CEE插座的有效性.
2.2.4Tower lighting/emergency lighting
Check the tower lighting for function by switching it on.Replace defect luminaries.
Check the function of the emergency lighting in the tower and the nacelle by simulating a power failure,e.g.by activating the fuses in the tower bottom.The emergency lighting must illuminate automatically.If required,the test switches located on the lamps can be turned on.
2.2.4 塔的照明/应急照明
打开塔的照明灯以检查其有效性.更换已失效的照明灯具.
通过模拟电源故障来检查塔及导流罩短舱内的应急照明的有效性;例如启动塔底的保险丝.应急灯必须能够自动照明,如有需要,可以打开灯具上的测试开关.
2.2.5Terminal points
CAUTION
230V AC/400V AC/690V AC Before the screw connections are inspected,the cable harness in the transformer substation must be disconnected.In addition,use insulated tools.
The screw connections in the terminal and connection cabinets are visually inspected and checked for tight fit.Tighten the nuts if required.(Refer to 2.3.3for torques)
2.2.5 接线柱
警告230V AC / 400V AC / 690V AC
检查螺旋接头前,必须预先断开变电站的电缆束.另外,必须使用绝缘工具.
肉眼检查接线柱及接线柜的螺旋接头是否紧固;如有需要,拧紧螺帽.(扭矩力度请参考2.3.3)
【英语牛人团】
In order to inspect the electric fittings in the foundation remove a metal plate from the ground platform and go down into the foundation.
2.1 地基
要检查地基的电气配件,移开地面平台的一块铁板,就可进入地基内部.
2.1.1water entry
inspect the foundation for traces of water entry in case of stagnant water ,this must be removed immediately.Renewed water entry must be prevented by re-sealing the joint between the lower tower segment and the foundation ring from the outside.
2.1.1 渗水
如发现积水,应检查渗水痕迹并即刻处理.为了避免再渗水,必须对底层塔区与底圈外部之间的接合处重新进行密封处理.
2.1.2lines,cables,and cable connections
visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion.Missing wear or edge protection must be refitted,if required,or correctly positioned.
2.1.2 电线、电缆及电缆连接器
以肉眼检查所有的电线、电缆及电缆连接器是否有破损与腐蚀.遗失的仪器或边角保护,如有需要必须重新装上或正确地放置.
2.1.3Potential equalization
Inspect the terminals of the ground cable for tight fit.Visually inspect the potential equalization rail for corrosion .If the rail is damaged severely,it must be replaced.
2.1.3 电位均衡
检查接地电缆的终端头确保紧密配合.肉眼检查电位钢轨是否被腐蚀.如果钢轨损坏严重,必须更换.
2.2Tower bottom/tower body
2.2 塔底/塔体
2.2.1Lines,cables,and cable connections
Visually inspect all lines,cables,and cable connections in the foundation for damage and corrosion .Missing wear or edge protection must be refitte,if required,or correctly positioned.The cables in the tower body must be tightened and must not sag.
2.2.1电线、电缆及电缆连接器
以肉眼检查所有的电线、电缆及电缆连接器是否有破损与腐蚀.遗失的仪器或边角保护,如有需要必须重新装上或正确地放置.塔体的电缆必须紧固,不可松弛下陷.
2.2.2Cable support
Inspect the tight assembly of the cable support and the tight fit of the cables in the supports.
2.2.2 电缆托架
检查确保电缆托架组件的紧固,以及托架上电缆的紧固配合.
2.2.3 Sockets
Check the shockproof and the CEE sockets for function,using a gauge.
2.2.3 插座
使用测量仪器检查抗电击及CEE插座的有效性.
2.2.4Tower lighting/emergency lighting
Check the tower lighting for function by switching it on.Replace defect luminaries.
Check the function of the emergency lighting in the tower and the nacelle by simulating a power failure,e.g.by activating the fuses in the tower bottom.The emergency lighting must illuminate automatically.If required,the test switches located on the lamps can be turned on.
2.2.4 塔的照明/应急照明
打开塔的照明灯以检查其有效性.更换已失效的照明灯具.
通过模拟电源故障来检查塔及导流罩短舱内的应急照明的有效性;例如启动塔底的保险丝.应急灯必须能够自动照明,如有需要,可以打开灯具上的测试开关.
2.2.5Terminal points
CAUTION
230V AC/400V AC/690V AC Before the screw connections are inspected,the cable harness in the transformer substation must be disconnected.In addition,use insulated tools.
The screw connections in the terminal and connection cabinets are visually inspected and checked for tight fit.Tighten the nuts if required.(Refer to 2.3.3for torques)
2.2.5 接线柱
警告230V AC / 400V AC / 690V AC
检查螺旋接头前,必须预先断开变电站的电缆束.另外,必须使用绝缘工具.
肉眼检查接线柱及接线柜的螺旋接头是否紧固;如有需要,拧紧螺帽.(扭矩力度请参考2.3.3)
【英语牛人团】
英语翻译2.1foundationIn order to inspect the electric fittings i
英语翻译1.electric fittings:02 air condition,separate line with
英语翻译[164:59.07]General Allenby arrived to inspect the troops
英语翻译Avaya reserves the right to review,inspect,and evaluate
英语翻译About disassembly.I have the main body of metal fittings
In the past several years,i had many chances to inspect many
英语翻译为什么不是直接it's said that he comes to inspect the army .
英语翻译The utility model relates to an enclosed electric stove
英语翻译1.colour:clear(transparent to inspect epoxy operation.)2
英语翻译long time not to write me,I cancel the my order to my su
英语翻译hi,in order to respect the privacy of GAO Li,i have to s
英语翻译(1/2)In order to reduce the length of this file,I have u